Cindy Bither
Administrative Assistant
P: (540) 464-7207
F: (540) 464-7443

111 Smith Hall
Lexington, VA 24450

Repairs Completed on Chessie Trail Bridge

LEXINGTON, Va., Oct. 11, 2013 – Structural repairs have been completed on the western-most foot bridge on the Chessie Nature Trail. The bridge has been made safe for pedestrians and is once again open for use.

With the bridge open, pedestrians may enter and exit the trail via Jordan’s Point.

The bridge had been closed since mid-September.

-VMI-